NPV and IRR calculator
By Sitraka Forler · Lecturer, Durham Business SchoolUpdated 16 October 2026 About this site
Net present value says how much a project adds in today's money at your cost of capital; the internal rate of return is the rate at which it adds nothing. Enter the cash flows, the outlay first, and a discount rate to get both, with the simple and discounted payback periods.
Free, no sign-up. Everything is computed in your browser: nothing you type is sent anywhere. Educational tool, not investment advice.
1. Calculator
The first value is today's flow (an outlay is negative), then one per year. Separate with commas, spaces or new lines; no thousands separators.
Your cost of capital or required return.
| Measure | Value | Unit |
|---|---|---|
| Net present value (NPV) | 278.27 | currency units |
| Internal rate of return (IRR) | 9.00 | % per period |
| Payback period | 3.87 | periods |
| Discounted payback period | 4.84 | periods |
| Undiscounted sum of flows | 3,000.00 | currency units |
Positive NPV: at 8.00% the project returns more than it costs, adding 278.27 in today's money.
2. The formulas
NPV(r) = Σ_{t=0..T} CF_t / (1 + r)^tIRR: r such that NPV(r) = 0
Payback = (t* − 1) + (−C_(t*−1)) / CF_t*
The first flow is undiscounted, as numpy_financial.npv does. Excel's NPV() discounts the first value it is given by a full period, so in a spreadsheet the outlay goes outside the function: =NPV(r, CF1:CFT) + CF0.
The IRR has no closed form: the calculator brackets the root and halves the bracket until it is narrower than 10⁻¹², the method the IRR page works by hand. Payback assumes each year's cash arrives evenly through the year; discounted payback runs the same count on present values.
3. Worked example
- A project costs €10,000 today and returns €2,000, €2,600, €2,800, €3,000 and €2,600 at the end of years 1 to 5.
- At 8%: 2,000 / 1.08 = 1,851.85; 2,600 / 1.1664 = 2,229.08; 2,800 / 1.259712 = 2,222.73; 3,000 / 1.36048896 = 2,205.09; 2,600 / 1.4693280768 = 1,769.52. They sum to €10,278.27, so NPV = +€278.27: accept.
- At 10% the same flows are worth €9,734.06 and NPV = −€265.94: reject. The IRR lies between, at 9.0016%, so the project clears any cost of capital below 9.00%.
- Payback: the running total is −8,000, −5,400, −2,600 after three years, and year 4 brings 3,000, so payback = 3 + 2,600 / 3,000 = 3.87 years.
- Discounted payback at 8%: the present values leave −1,491.25 after four years and year 5 adds 1,769.52, so 4 + 1,491.25 / 1,769.52 = 4.84 years.
Payback says the money comes back in under four years; only the NPV says whether it comes back with the 8% return it needed, and how much is left over. The glossary NPV page continues this example with a terminal value.
4. The Python behind it
import numpy as np
from scipy.optimize import brentq
cf = np.array([-10_000, 2_000, 2_600, 2_800, 3_000, 2_600]) # t = 0, 1, ..., 5
t = np.arange(cf.size)
def npv(rate):
return (cf / (1 + rate) ** t).sum()
irr = brentq(npv, -0.99, 10) # the rate where NPV crosses zero
def payback(flows):
cum = np.cumsum(flows)
j = np.argmax(cum >= 0) # first period the total turns non-negative
return j - 1 + -cum[j - 1] / flows[j]
print(f"NPV at 8%: {npv(0.08):.2f}") # 278.27
print(f"IRR: {irr:.4%}") # 9.0016%
print(f"Payback: {payback(cf):.2f} years") # 3.87
print(f"Discounted payback: {payback(cf / 1.08 ** t):.2f}") # 4.845. Reading the result
- When NPV and IRR disagree, for example between two projects of different size, follow the NPV: it is measured in money, the IRR in a rate.
- Cash flows that change sign more than once can have several IRRs or none. The calculator warns you and the NPV still decides.
- Payback ignores everything after the payback date. It measures how fast the outlay comes back, not whether the project is worth doing.
- The rate must match the period of the flows: monthly flows need a monthly rate, and the IRR comes out per month.
Learn the concept
- Net Present Value (NPV) & DCF: Today's value of future cash flows, discounted for time and risk.
- Internal Rate of Return (IRR): The discount rate that makes a project NPV exactly zero.